Project Overview

Gephart was the design-build electrical contractor for this new 25,000 SF, 48-bed facility designed to care for older adults and those seeking mental healthcare. This single-story building features a centralized nursing station, medical clinic area, and multiple procedure rooms including transcranial magnetic stimulation (TMS) and electroconvulsive therapy (ECT).

Our Work

As the design-build partner on the Core Management Team (CMT), Gephart’s contributions included:

  • Installed new underground fiber optic lines spanning over 2,000 feet to the existing facility
  • Utilized Trimble and BIM technologies for coordination, fast-track layout, and installation
  • Prefabricated conduit racks and in-wall rough in assemblies
  • Emergency generator backup
Success
  • Kept project on aggressive 8-month schedule by streamlining installation with BIM, Trimble and prefabrication.
  • Delivered project $125,000 under budget and maximized profit pool while returning the savings to the Owner.
Quick Facts/Highlights
  • Behavioral & mental healthcare facility
  • 48 beds
  • IPD project
  • $125,000 under budget
  • Completed project on aggressive 8-month schedule
Service
Client
DeAngelis Diamond Healthcare Group
Budget
$1,255,000
Markets
Healthcare