Sports Facilities

U.S. Bank Stadium

Minneapolis, MN
Quick Facts/Highlights
  • Over 66,000 seats
  • 1,750,000 SF
  • Over 21,000 LED light fixtures
  • Almost 18 billion watts
  • $2.5 million of accepted value analysis options
  • Job completed 6 weeks ahead of schedule
Service
Client
Mortenson Construction
Budget
$107,500,000
Markets
Sports Facilities
Partners
    Gunnar Electric
Project Overview

Through the joint venture Build 23, Gephart Electric served as the design-assist electrical contractor to build U.S. Bank Stadium. This 1,750,000 SF stadium located in the heart of Minneapolis is home to the Minnesota Vikings and towers nearly 30 stories high. It is the first new NFL stadium to feature an LED sports lighting system and features over 21,000 LED light fixtures and almost 18 billion watts.

Our Work

Gephart provided design-assist, electrical construction, and low voltage systems for the construction of this state-of-the-art stadium. Gephart’s contributions included:

  • Sports lighting element reductions based on calculations
  • Alternate light fixture design
  • Expanded use of underground feeder installations
  • Early completion of permanent power to reduce construction heating costs and allow early start-up activities for mechanical
  • Switchgear configuration modifications to save on equipment costs and allow additional architectural space
  • Generator reductions and relocation to allow additional architectural space
  • Early procurement based on modeling efforts
Success
  • Identified and incorporated over $2.5 million of accepted value analysis options during the preconstruction process.
  • Completed the job six weeks early by identifying alternative means and methods, materials, layouts and work sequences that reduced cost, increased efficiency, and reduced schedule durations.
  • Exceeded the Target Group Business and Workforce Utilization goals by working alongside our valued woman-owned Construction Partnering Program (CPP) partner Gunnar Electric.
Testimonial
"The services, professionalism and leadership that were displayed by the Gephart team on the US Bank Stadium project was unparalleled. From the craft in the field all the way to the top of their organization, Gephart hit the mark on all fronts. They provided outstanding design-assist services that were critical in maintaining tight budgets and superb leadership to adhere to an extremely challenging schedule. Gephart is a trusted trade partner that we value very much. We have built some amazing projects with their team and hope to continue the great relationship we have on future projects."
Eric Grenz, Construction Executive, Mortenson
Quick Facts/Highlights
  • Over 66,000 seats
  • 1,750,000 SF
  • Over 21,000 LED light fixtures
  • Almost 18 billion watts
  • $2.5 million of accepted value analysis options
  • Job completed 6 weeks ahead of schedule
Service
Client
Mortenson Construction
Budget
$107,500,000
Markets
Sports Facilities
Partners
    Gunnar Electric
Gephart Shield Icon