Manufacturing

Personalized expertise through every step of the job

We have decades of experience serving the manufacturing industry through high-quality, cost-effective leadership in a wide range of environments spanning from assembly lines to cleanroom facilities. Our experts deliver personalized know-how through every phase of the project to ensure it’s tackled the right way the first time, all the way to completion. Gephart is here to collaborate and drive the schedule on your next manufacturing job, no matter its size, profile, or complexity.

Case Studies
Projects at a Glance
Select a Market

Projects at a glance

8 projects
SICK, Inc.
Location:Bloomington, MN
Client:Ancoats, LLC
Size:125,000 SF
Details:New office and warehouse with LED lights and controls, distribution, emergency generator, mechanical wiring, general power, fire alarm system and low voltage rough in.
Upsher-Smith Headquarters
Location:Maple Grove, MN
Client:Ryan Companies
Size:130,000 SF
Details:New expansion including office, warehouse and manufacturing spaces. This technical project included complex lighting control systems, UPS addition, site lighting additions, AV system additions, and extension of existing lightning protection and fire alarm systems.
Sage
SageGlass
Location:Faribault, MN
Client:Ryan Companies
Size:300,000 SF
Details:Design-build expansion project for a self-tinting glass manufacturer. Manufacturing area included six new cleanrooms with over 200 tons of air conditioning, humidity control, 50+ HEPA filter modules, sealed ceiling lighting, modular distribution, etc.
Schulz Xtruded Products
Schulz Xtruded Products
Location:Tunica, MS
Client:JESCO Construction
Size:450,000 SF
Details:Fast-track build of seamless metallurgical bonded pipe and extruded shapes/profiles manufacturing facility.
Heraeus
Heraeus
Location:White Bear Lake, MN
Client:Sheehy Construction
Size:25,000 SF
Details:Design-build project for a medical parts manufacturer that included cleanrooms with sealed/gasketed fixtures, cord drops, HEPA filter wiring and connections for processing equipment. Local panelboards were provided within each cleanroom.
Semiconductor Fabrication Building
Location:Burnsville, MN
Client:Knutson Construction
Size:80,000 SF
Details:Design-build construction of a 10-cleanroom, state-of-the-art semiconductor manufacturing facility. Project required significant use of BIM for trade coordination and utilization of clean construction methods.
Rock Wool Manufacturing
Rock Wool Manufacturing Facility
Location:Byhalia, MS
Client:NA
Size:600,000 SF
Details:Installed power, controls and network connections to process equipment including installing the process control panels, associated wiring and programming assistance as well as the industrial networking and line safety systems.
Crown Cork & Seal Can Line Conversion
Crown Cork & Seal Can Line Conversion
Location:Batesville, MS
Client:Crown Cork & Seal Company, Inc.
Details:Converted two existing 12-ounce aluminum can lines to 16-ounce, including the replacement and upgrade of the can decorators (which paint and label cans), the decorator ovens, the internal can lining spray system, and the linear ovens.